Deux Rives Gym Addition

SD 93 hired HMC as Construction Manager to enable on time delivery of the time sensitive prefab project. HMC self performed all formwork, concrete and framing work on this project. The install of the CLT was done in collaboration with BeamCraft, which made this project a success.


Architect: Studio Hub Architects
Images: Dirk Schoenmaker